hyperlink button to 'About Butcher and Associates' page
hyperlink button to 'News' page
hyperlink button to 'Residential' page
hyperlink button to 'Multi-Family' page
hyperlink button to 'Commercial' page
hyperlink button to 'Resort/Hospitality' page
hyperlink button to 'Municipal/Public Safety' page
hyperlink button to 'Military/Government' page
hyperlink button to 'Contact Us' page
hyperlink button to 'Staff Notes' page
hyperlink button to 'On The Boards' page
hyperlink button to 'In The Ground' page
hyperlink button to 'Out of The Ground' page
hyperlink button to 'On The Walls' page
hyperlink button to 'In General' page

 

 

 

On the Boards:

Livingston County Airport Terminal - Butcher & Associates, PC has partnered with RS&H Aviation to design a new General Aviation Terminal at Livingston County Airport (OZW) in Howell, Michigan.  The terminal, a one story structure will include administrative offices, a pilot lounge and planning area, a car rental office, conference rooms, and passenger waiting areas.  The project is funded through MDOT Aeronautics and is scheduled for construction in 2011.  Our engineering team includes RS&H of Flint, MI and Scales & Associates of Detroit, MI.

Camp Grayling Training Site - Dining Facility - Butcher & Associates, PC has been awarded the Design Contract for a proposed $1.8 million Dining Facility near the entrance to Camp Grayling.  The 8400 SF facility will serve up to 400 personnel per meal and will be located across the street from the new Post Headquarters.  Our Engineering partners are William A. Kibbe & Associates, of Saginaw, MI.

Otsego Lake Township Fire Department - Expansion Feasibility Study - Butcher & Associates, PC has been working with the township to evaluate the existing fire station building for the purpose of renovating and expanding to accommodate fire protection needs in the future.  Several alternatives are planned based upon practical construction methods, available space on the existing property, and budget/funding sources.  The end product of the study will provide the township board with the information necessary to make an informed decision about the fire department and its equipment and facilities.

Otsego County Animal Control Facility - Butcher & Associates, PC has been working with the Department of Animal Control in Otsego County to evaluate the options for replacing the outdated current animal shelter.  The options will include the evaluation of several existing buildings for conversion to a shelter, as well as considering the construction of an entirely new facility in the community.

Kinross Township EMS Facility - Butcher & Associates, PC has been selected to design a new Fire and EMS Facility for the Township of Kinross in Michigan's upper peninsula. The facility is projected to be approximately 20,000 SF and will be located near the Chippewa County International Airport.  The project is currently awaiting funding.

Inspiration comes from many sources, and also can be expressed in many mediums.  Butcher & Associates produces renderings, massing models and other digital graphics to help clients gain a clearer understanding of their project's design.  Drawings are produced on AutoCAD Architecture and Google's SketchUp software is used to produce renderings and massing models.  Of course there will always be a place for hand drawn sketches.  Click on the link below and you will see a variety of renderings produced by Bradley J. Butcher & Associates personnel:

residential renderings  non-residential renderings

Residential | Multi-Family | Commercial | Resort/Hospitality | Municipal/Public Safety | Military/Government
Contact Us | News | Home | Site Map

Copyright © 1996 - 2010 Bradley J. Butcher & Associates, PC All rights reserved

Site Creation & Design By
Wink Creative